Work Instruction GUIDE-SYSTEM
Guide System 23 Form drilling After pre-drilling, the implant bed is prepared up to the planned implant length in ascending drill length (7* respectively 9, 11, 13, 16 mm) using the internal irrigation Guide System form drills. *only with CONELOG ® SCREW-LINE implants with a diameter of 3.8 mm and 4.3 mm Internally irrigated Guide System form drills Drilling sequence in ascending length to the borehole extension up to the defined implant length. Length 7 mm 9 mm 11 mm 13 mm 16 mm
RkJQdWJsaXNoZXIy MTE0MzMw