CONELOG PROGRESSIVE-LINE Surgical procedures
18 CONELOG ® PROGRESSIVE-LINE IMPLANT IMPLANT BED PREPARATION GENERAL DRILL EXTENSION A drill extension is available to prevent resting of the angled handpiece on the remaining dentition during preparation of the implant bed adjacent to elongated teeth. DEPTH STOP FOR PILOT DRILLS An attachable depth stop limits the drilling depth to either 7, 9, 11 or 13 mm. Final form drilling should be performed without a depth stop if the implant is to be placed epicrestally (see page 24). Drill extension Depth stops SCREW-LINE The implant bed preparation for CONELOG ® PROGRESSIVE-LINE Implants is identical to the implant bed preparation for CONELOG ® SCREW-LINE Implants in certainwork sections. Therefore, the pilot drills as well as their depth stops, the drill extension and the paralleling pin SCREW-LINE can also be used for preparing the implant bed of the CONELOG ® PROGRESSIVE-LINE Implants. 7 mm 13 mm 11 mm 9 mm NOTE It is important that the last form drill as well as the dense bone drill (or alternatively the tap) of the CONELOG ® PROGRESSIVE- LINE System are used. SURGICAL PROCEDURE
RkJQdWJsaXNoZXIy MTE0MzMw